2221
More Report pages
Report Author: Agbata Dickson Ukolojo
2221
Share template with others
Report submitted for the FP20 Analytics ZoomCharts Challenge, January 2025. The report was built using the Airline Delays Dataset and includes ZoomCharts custom Drill Down PRO visuals for Power BI.
Author's description:
The analysis is categorized into three categories, overview, delay patterns, and delay factors:
• Overview: Summarizes overall trends in flights and delays, airlines delay, and airports.
• Delay Patterns: Focuses on identifying delays in minutes trends by month, airline delay occurrence, and performance.
• Delay Factors: Dives deeper into what causes delays and how geography influences them.
Participate in data challenges, build and submit reports to get free template downloads.
Join CommunityMobile view allows you to interact with the report. To Download the template please switch to desktop view.
How to use a PBIX template
Preview the interactive report, download the PBIX file, open it in Power BI Desktop, and replace the same data connection with your own dataset.
Preview and download
Explore the report online and download the PBIX template file.
Open in Power BI Desktop
Open the downloaded PBIX file in Power BI Desktop.
Connect your data
Replace the sample data source with your own dataset.
Refresh and adjust
Refresh the model and update fields or visual were needed.
Save and share
Save your report and publish it for your audience.